Swimming Pool Remodel Proposal
PROJECT PROPOSAL
1002 Cardinal Ln  •  Richardson, Texas 75080
Prepared For
Matt Feetham
Presented By
Feild Patten
Jose Chavez
Date
April 15, 2026
0 1  •  W H O    W E    A R E
About Us
Custom Home Standards Applied Outdoors

Cascades was founded by Natalie and Feild Patten, owners of Patten Custom Homes and recipients of DBest Builder honors from 2021 through 2025. What began in 2015 as an extension of their building and development companies has grown into a dedicated outdoor construction brand focused on luxury pools, spas, and exterior living environments.

That background matters. We approach every project with the same discipline, detailing, and structural mindset expected in a high-end custom home. The result is not simply a beautiful backyard, but a finished environment engineered with intention and built to endure for generations.

Every detail is crafted with intention.
Luxury is only meaningful when it is built to last.
Natalie & Feild Patten
Natalie & Feild Patten
Founders
Designs Others Won’t Touch
Innovation Without Boundaries
“If you can imagine it, we will try it.”
Glass View Walls
Steel Pergolas
Intricate Water Features
Reflecting Pools
02 • Site Plan
The Design
Existing freeform pool and raised spa on a 10,812 SF corner lot. Proposed kitchen structure positioned in corner against the alley fence. Pool pad and equipment concealed behind kitchen with access gates to alley and yard. New custom poured and stamped concrete natural hardscape with 4-inch live grass joints throughout.
1002 Cardinal Site Plan — 86.5 x 125 ft lot
02 • The Vision
The Concept
Rear yard rendering
Overhead aerial view
03 • Pool Specifications
Pool Specifications
Pool Renovation
Scope of Work
Coping12×24 tumbled travertine
Waterline TileAqua Bella Rivers Yukon 1×2
Interior FinishNPT French Gray Mini Pebble
PlumbingFull replacement • long runs + gas
ElectricalFull rewire • bonding • LED
Lighting2× MicroBrite pool • 1× spa
Hardscape~1,500 SF poured stone w/ turf joints
Equipment Package
Equipment
PumpIntelliFlo3 VSF 3HP
FilterClean & Clear Plus 520QF
HeaterMasterTemp 400K BTU NG
ControlsIC40 Pool/Spa w/ CVA
Salt SystemIntelliChlor Plus 30K
LightsColor MicroBrite LED
BlowerSilencer Air Blower
The Remodel Process
Demolition Sequence
Coping removal
REMOVE COPING
STEP 1
Sawcut perimeter, break and remove existing stone, prep bond beam for new coping.
Tile removal
REMOVE TILE
STEP 2
Chip out waterline tile, remove old mortar bed, clean and prep surface for new tile.
Plaster chip-out
REMOVE PLASTER
STEP 3
Chip out interior surface, expose structural shell, prep for new pebble finish.
Installation Sequence
New Materials Set
Coping installation
SET COPING
STEP 4
Set new 12×24 tumbled travertine coping, full pool and spa perimeter, mitered corners.
Tile installation
SET TILE
STEP 5
Install Aqua Bella Rivers Yukon 1×2 waterline tile, full perimeter pool and spa.
Plaster installation
APPLY PLASTER
STEP 6
Apply NPT StoneScapes French Gray Mini Pebble, water fill, startup, and handoff.
The Result
Before + After
Before and After — 1002 Cardinal Pool Remodel
Specification Details
Equipment + Feature Details
Pentair equipment package specified for 1002 Cardinal. Final model confirmation per attached proposal.
Pentair Equipment Package — 1002 Cardinal
04 • Materials + Selections
Finishes
Surface Finish
Interior Plaster
StoneScapes Mini Pebble Series. Premium mini-pebble aggregate plaster in French Gray.
NPT PLASTER CATALOG
Click to view
FRENCH GRAY MINI PEBBLE
APPLICATION • FRENCH GRAY IN WATER
Coping
Pool Coping
Faber Stone CNK 12×24 Tumbled Classic travertine with bullnose edge.
FABER STONE CATALOG
Click to view
12×24 TUMBLED CLASSIC
APPLICATION • COPING INSTALLED
Tile
Waterline Tile
Aqua Bella Rivers Yukon 1×2 natural stone mosaic. Installed full perimeter on pool and spa.
RIVERS YUKON 1×2
APPLICATION • WATERLINE DETAIL
Hardscape
Decking System
Poured-in-place natural stone using precision silicone forms. 4″ live turf joints throughout.
SILICONE FORM SYSTEM
APPLICATION • PEEL & REVEAL
05 • Perspectives
Renderings
Rear yard primary rendering
Modern kitchen variant
Wood frame kitchen variant
05 • Additional Views
Renderings
Fire pit seating area
Overhead aerial view
Kitchen POV looking at pool
06 • Investment + Payment Schedule
Pool Budget
Pool Renovation ScopeAmount
Tile Removal & Installation — full perimeter pool + spa$4,800
Electrical — complete rewire, bonding, LED lighting, GFCI, equipment connections$8,500
Plumbing — replace ALL long-run plumbing, new gas line, full equipment connect$18,500
Plaster & Demo — full chip-out to bare gunite, NPT StoneScapes Mini Pebble French Gray$16,500
Coping Labor & Demo — remove existing, install new 12×24 tumbled travertine, full perimeter$7,500
Tile & Coping Material — Aqua Bella Rivers Yukon tile + travertine coping, supplied & delivered$5,500
Pool Equipment Package — pump, filter, heater, salt system, automation, lights, blower$16,200
Pool Renovation Total$77,500
PAYMENT SCHEDULE
Draw 1 • Deposit
Contract signed — scheduling + mobilization35%
Due at signing$27,125
Draw 2 • Demo + Rough-In
Demolition complete • plumbing rough-in30%
Due at milestone$23,250
Draw 3 • Installation
Coping + tile + equipment set25%
Due at milestone$19,375
Final • Completion
Plaster cure + startup + walkthrough10%
Due at completion$7,750
AUTHORIZATION TO PROCEED
Matt Feetham
Feild Patten, Cascades Pool + Spa
07 • Binding Agreement • Scope of Work
Pool Contract
Swimming Pool Remodel Agreement
Between the Owner: Matt Feetham  •  Contractor: Cascades Development DFW LLC
Project: 1002 Cardinal Ln, Richardson, TX 75080
Contractor shall furnish all labor, supervision, materials, equipment, and supplies necessary to complete a luxury remodel of the existing swimming pool at 1002 Cardinal Ln, Richardson, Texas 75080. Work shall be performed in a good and workmanlike manner using new materials and equipment appropriate for a premium residential renovation.
What's Included
Pool Remodel Scope
  • Drain and protect existing pool and adjacent areas
  • Remove existing waterline tile and prepare substrate
  • Remove existing coping and reset bond beam as required
  • Chip out existing interior finish to sound shell
  • Install new waterline tile, coping, and interior finish
  • Replace pump, filter, heater, automation, and lights
  • Reconnect plumbing and electrical to new equipment layout
  • Refresh surrounding decking / hardscape in remodel area
  • Perform startup, initial balancing, and owner orientation
  • Leave project clean and ready for use
Technical Details
Remodel Specifications
Tile Scope
Contractor shall remove all existing waterline tile, repair wall conditions as needed, and install new premium tile with setting materials, grout, sealers, and clean transitions.
Coping Scope
Contractor shall remove existing coping, prep the bond beam, and install new natural stone coping with site cuts, corners, and grout/mastic transitions.
Plaster Scope
Contractor shall chip out the existing interior finish to sound shell conditions, prep the vessel, and apply a new plaster or aggregate finish as selected.
Equipment Scope
Contractor shall provide and install a Pentair equipment package consisting of new pump, filter, heater, automation, and pool lighting, with startup and testing.
Contract Terms
Remodel Clarifications
Included Renovation Work
Contractor shall furnish all labor and material necessary to complete the renovation items expressly identified in this proposal, including demolition of finishes, surface preparation, installation of new finish materials, equipment replacement, and associated startup. All work shall be coordinated through Contractor and performed by trained personnel or trade partners under Contractor supervision.
Not Part of This Scope
This proposal does not include excavation for a new shell, new gunite or shotcrete shell construction, pool enlargement, rebar cage replacement, or structural redesign of the vessel unless a written change order is issued after discovery of concealed conditions.
Warranty
Workmanship + Materials
Contractor warrants installation workmanship for a period of twelve (12) months from substantial completion. Material warranties remain with their respective manufacturers. Normal characteristics of cementitious finishes, aggregate finishes, natural stone, and mosaic tile - including color variation, mottling, shade change, or minor texture variation - do not constitute defects.
  • Improper water chemistry, startup neglect, or misuse void finish-related warranty coverage
  • Pre-existing shell movement, groundwater pressure, or hidden substrate defects are excluded
  • Damage caused by other trades, freeze events, or acts of God is excluded
  • Owner must provide written notice of suspected defect within 10 days of discovery
  • Contractor must be given reasonable access to inspect and correct covered work
  • Change orders adjust schedule and cost as required by added work
Hardscape Investment
Decking Options
Four coverage and finish levels for the rear yard hardscape. All options include full base preparation, compaction, color finishing, and seal. Choose the level that fits your vision and budget.
Option A • Premium Stone — Full Yard
Coverage1,500 SF
MethodSilicone form stone
Joints4″ turf-filled
FinishMulti-tone + antiquing
Investment$37,500
Option B • Stone Border + Stamped Outer
Coverage1,500 SF
Pool border750 SF silicone stone
Outer yard750 SF Ashlar stamp
FinishColor hardener + seal
Investment$28,000
Option C • Stamped Concrete — Full Yard
Coverage1,500 SF
MethodStandard stamp mats
PatternAshlar slate or flagstone
FinishIntegral color + 2-coat seal
Investment$19,500
Option D • Stamped — Pool Perimeter Only
Coverage750 SF
Area3–4′ band around pool
PatternColor-matched to coping
Remaining yardAs-is
Investment$10,500
DECKING NOTES
  All options include demolition of existing surfaces where required, base prep, and final sealing.
  Options A and B include turf joint installation. Options C and D are continuous pours.
  Decking scope is independent of pool renovation and can be added or removed without affecting pool pricing.
08 • Outdoor Entertaining
Kitchen Design
A fully covered outdoor kitchen positioned in the NW corner of the lot, designed for year-round entertaining with direct sightlines across the pool. Two structure options shown.
Option A — Steel structure, modern open design
Option B — Cedar wood frame structure
Finish Selections
Materials + Appliances
Kitchen materials and appliance selections
09 • Materials + Appliance Allowances
Kitchen Specifications
Core Build
Structure
Base ConstructionCMU block base with reinforced support
CountertopsPremium outdoor-rated stone / porcelain allowance
Cooking ApplianceBuilt-in grill allowance
VentilationDecorative vent hood enclosure
Facing MaterialStone or tile veneer to coordinate with pool palette
UtilitiesGas, electrical, and final equipment hookups
Planned Program
Kitchen Features
Grill Zone
Built-in grill centered on the counter run with service access below.
Counter Space
Dedicated prep and serving surfaces sized for active entertaining.
Vent Hood
Architectural hood cover to contain cooking visually and functionally.
Storage Base
CMU base designed to receive access panels, doors, and equipment openings as needed.
Material Direction
Pool + Kitchen Continuity
Counter Finish
Target a warm-gray or soft taupe stone tone that bridges the brass accents of the presentation with the cooler exterior finish palette.
Base Finish
CMU base may be clad in stone, tile, or stucco depending on final site direction and appliance coordination.
Coordination Note
Final appliance model numbers and cut sheets will be confirmed before shop drawings and rough utility placement.
10 • Kitchen Options + Pricing
Kitchen Budget
Option F
Full Outdoor Kitchen — As Designed
Full Kitchen ScopeAmount
Reinforced Slab w/ Piers (12×12)$9,500
L-Base Masonry Build (labor + install)$6,200
Steel Structure (4 posts, powder-coated)$19,000
Wood Framing (beams, rafters, fascia, stain)$16,000
Standing Seam Metal Roof$4,500
Countertops — Honed Leather Granite (~30 LF)$7,000
Appliances — BLAZE Package$8,000
Appliance Installation$2,800
Kitchen Plumbing (gas + water + drain)$3,000
Kitchen Electrical (lighting + outlets + fan)$4,000
Full Kitchen Total$80,000
Option L
Simplified Kitchen — Budget Alternative
Budget Kitchen ScopeAmount
Concrete Slab 10×10 (thickened edge, no piers)$5,500
Simple Block Base — L-shape (stucco finish)$4,200
Wood Pergola (6×6 posts, no steel)$9,500
Polycarbonate Roof Panels$2,200
Poured Concrete Countertop$3,800
Grill Installation Only (owner-provided grill)$1,500
Basic Plumbing (gas stub only)$1,500
Basic Electrical (2 outlets + pendant light)$2,200
Budget Kitchen Total$30,400
KITCHEN NOTES
  Option F includes both steel and wood structural components. Option L replaces steel with treated wood pergola.
  Appliance selections, countertop material, and finish cladding may adjust the final contract amount.
  Owner provides brick and stone veneer for base construction (Option F, Line F2) if selected.
  Payment accepted via check or bank wire only.
11 • Binding Agreement • Scope of Work
Kitchen Contract
Outdoor Kitchen Construction Agreement
Between the Owner: Matt Feetham  •  Contractor: Cascades Development DFW LLC
Project: 1002 Cardinal Ln, Richardson, TX 75080
Contractor shall furnish labor, supervision, materials, and supplies necessary to construct the outdoor kitchen shown in the proposal imagery, including CMU base construction, countertop installation, grill allowance, hood enclosure, rough utility coordination, finish cladding, and trim-out.
  • Field verify kitchen location and final footprint
  • Construct reinforced CMU base and support structure
  • Provide countertop allowance and fabrication coordination
  • Provide built-in grill allowance and hood enclosure
  • Coordinate gas, electrical, and required hookups
  • Install selected finish materials to exposed faces
  • Complete trim-out, testing, and final cleanup
  • Deliver a finished kitchen ready for owner use
Clarifications
Kitchen Scope Notes
Utility Coordination
Gas, electrical, and any venting requirements are based on field-verifiable access. Hidden field conditions may require adjustment by change order.
Selections
Appliance models, finish cladding, and countertop slabs shall be selected from approved allowances before fabrication begins.
Exclusions
Refrigeration, sink, beverage equipment, specialty storage, and custom metalwork are excluded unless specifically added in writing.
Acceptance
This agreement may be withdrawn if not accepted within ten (10) days. After acceptance, owner may cancel within three (3) days, subject to costs already incurred.
12 • Project Rhythm
Timeline
Week 1
Drain pool, protect site, begin demolition of existing coping, tile, and interior finish. Verify kitchen layout and utilities.
Weeks 2-3
Shell prep, bond beam corrections, equipment rough-in, kitchen base work, and finish material procurement.
Weeks 4-5
Install coping, tile, equipment package, hardscape refresh, kitchen countertops, and exterior finish materials.
Target Duration
Cascades targets completion within six (6) to eight (8) weeks from mobilization for this remodel and kitchen scope, subject to timely selections, normal weather conditions, material availability, and change orders.
Milestones
Expected Sequence
  • Demo + protection
  • Prep + equipment rough-in
  • Coping / tile / hardscape installation
  • Kitchen build + finish trim-out
  • Plaster, startup, and final walkthrough
Schedule Notes
Important Considerations
Remodel schedules are sensitive to hidden field conditions once demolition is complete. If concealed plumbing issues, bond beam deterioration, or utility conflicts are discovered, Cascades will document the condition and issue a written recommendation before proceeding with any added work.
T E R M S
Exclusions & Change Orders
Not Included
Exclusions
The following items are excluded unless added by written change order.
  • Hidden structural shell reconstruction beyond visible prep scope
  • New excavation, pool enlargement, or new gunite shell work
  • Additional retaining walls, fencing, or site drainage beyond listed scope
  • Specialty kitchen appliances not covered by stated allowance
  • Furniture, televisions, speakers, and decorative accessories
  • Work caused by owner-requested revisions after approved selections
Selections
Material Confirmations
Waterline Tile
Pool Coping
Pool Finish
Deck Finish
Countertop
Kitchen Facing
Grill Model
Vent Hood
Selections may be modified by written addendum prior to procurement.
Modifications
Change Orders
A written change order is required for any change to scope, materials, or schedule. Change orders over $200 must be approved in writing. Fifty percent (50%) of the added cost is due before work begins, with the balance due upon completion of the change order item.
Important
Once materials are ordered or fabrication begins, revised selections may trigger restocking fees, added lead time, or pricing adjustments. Requests should be directed to feild@cascadesdallas.com.
Payment
Draw Request
cascades
Cascades Development DFW LLC
Feild Patten
214.629.1515
feild@cascadesdallas.com
BILL TO
Matt Feetham
PROJECT
1002 Cardinal Ln
Richardson, TX 75080
Invoice #
Date
Draw #
Due DateOn Receipt
PO Number
ItemQtyRateAmount
Subtotal
Tax (0%)$0.00
Total Due
NOTES
PAYMENT INSTRUCTIONS
Please remit payment via wire transfer or check.
Make checks payable to: Cascades Development DFW LLC

Wire Instructions:
Cascades Development DFW LLC
Cadence Bank
Routing: 084201278
Account: 82095563
Modification
Change Order
cascades
Cascades Development DFW LLC
Feild Patten
214.629.1515
feild@cascadesdallas.com
BILL TO
Matt Feetham
PROJECT
1002 Cardinal Ln
Richardson, TX 75080
Change Order #
Date
Payment TermsDue on approval
PO Number
DescriptionQtyRateAmount
Change Order Total
NOTES
TERMS
  All change orders must be approved in writing before work begins
  50% of change order cost due prior to work, 50% upon completion
  Additional time for change orders adjusts the project completion date
  Payment via wire transfer or check only
APPROVED BY
Matt Feetham
Print Name
P R O V I S I O N S
General Provisions & Duties
All work shall be performed in accordance with approved selections, applicable codes, and accepted industry standards. Contractor shall coordinate the work and remove construction debris upon completion. If concealed conditions differ materially from what could reasonably be observed before demolition, Contractor may propose an equitable adjustment by written change order before proceeding.
Agreement
Acceptance
This document is a legal and binding agreement by and between the parties. It may be withdrawn by Contractor if not accepted within ten (10) days. After acceptance, Owner may cancel within three (3) days. Design, procurement, scheduling, or permit-related costs already incurred remain payable.
CONTRACT SUMMARY : SELECT SCOPE
Pool Renovation
$77,500
Outdoor Kitchen (Full)
$80,000
Selected Project Total
Based on selected scope above
$100,000
POOL + FULL KITCHEN
$157,500
POOL ONLY
$77,500
POOL + BUDGET KITCHEN
$107,900
Accepted this _______ day of _________________ 20_____
Matt Feetham
Feild Patten, Cascades Pool + Spa
cascades
Pool  •  Spa  •  Outdoors
THANKS
your retreat. reimagined.
cascadesdallas.com  •  feild@cascadesdallas.com  •  (214) 629-1515